Winter Concrete Construction(573) 645-7899Free estimate
03Poured to code, ready to build on

Foundations

Residential foundations, slabs on grade, and stem walls. Poured to code and ready for your contractor to build on.

Typical rate$5.90 – $6.50 / sq ft

Labor and materials together — the finished job, not a labor rate. It is a typical range, not a quote, and your job can fall outside it. The quote comes after we've seen the site, free and in writing.

What's included

Scope you can
hold us to

  • Footings, stem walls and slabs on grade
  • Forming, rebar placement and inspection scheduling
  • Vapor barrier and under-slab preparation
  • Anchor bolts and embeds set to plan
  • Garage, shed and addition pads

How we quote it

We come out, look at the site, and leave you with a straight written quote — free, and with no obligation. Square footage sets the starting point; access, slope, drainage and how much base has to go in move it from there.

Once you're booked you get a confirmed start date and our own crew. We don't subcontract the work out, which is the main reason that date holds.

Straight answers

Common questions

01What kinds of foundations do you pour?

Footings, stem walls and slabs on grade, plus pads for garages, shops and additions. Poured to code and left ready for your contractor to build on.

02How much does a foundation cost?

It depends which part. Floors run $5.90–$6.50 a square foot plus $300–$500 for the power trowel. Footings are $8 a linear foot of labor, and walls are $15–$25 a linear foot up to six feet tall, or $28–$32 a square foot of face above that. Excavation, how deep the footings have to go and what the subgrade is doing move it more than square footage alone does, which is why this one always gets walked before it gets quoted.

03Do you pull the permit and handle inspections?

We handle permits where they're required and schedule the inspections that go with them. If your project needs one you'll hear it from us upfront, not partway through.

04Can you work to my builder's plans?

Yes. Anchor bolts and embeds get set to the plan, and vapor barrier and under-slab prep are part of the pour. Tell us who's building on it and we'll coordinate the handover.

Free · No obligation

Get your free estimate

Tell us what you need. We come out, take a look, and give you a straight written quote.

Price my projectCall (573) 645-7899

Answered Monday to Saturday.

CallFree estimate